Summary for the 108th + 109th Gensokyo v3 Building Meetings 1/15/2022 + 2/5/2022:
*ctrl+c* *ctrl+v*
Communication is key, during the breaks we have between these meetings talk to others about projects, work on things etc. etc.
Pro-tip for terraforming so you're not suffering. Just terraform the area around the place you're porting in. Saves more time, saves more lives.
Y'all miss me? :3
Build meeting 108: We worked more on terraforming! Didn't do a whole lot, since Birb and I had to leave really early on, but it be like that sometimes. It's ok though, because this next build meeting, we actually did get quite a lot done!
Build meeting 109: We continued terraforming, focusing on two areas in particular: the right end of the lower residential district, and the ceiling of the top floor of the whole KV cave itself. The right end of the lower residential district had its entrance to the hydraulic system that leads to the surface decorated (#ThankYouBasedRedleaf) and the cave itself was shaped more towards that end to make it look less like a box. (#ThankYouBasedBirb)
The top floor of the KV finally had the rest of its stalactites pasted in (#ThankYouBasedMe), and terraforming to make them look more natural has begun. Ideally, I'd like to start working lighting into the top floor next build meeting, as well. In addition, I've also marked 5-6 areas in the KV top floor ceiling for potential dripstone patches, if we still want to go forward with that design choice.
The build meeting is still happening as I type this, but I'd really rather get this typed out sooner than later so I won't heckin' forget it again goddamnit--
The trailer has been uploaded. Thank you for trusting koko bc it finally happened. Check it out here!
Next building meeting is on February 19th, 2022 4pm EST.